Loading...
"CLICK HERE TO JOIN NOUN WHATSAPP GROUP"
Digital Clock With Date
Day, Month 00, Year
   
00: 00: 00 AM
     

National Open University of Nigeria NOUN Admission for 2025 Academic Session still ONGOING/ACTIVE. Due to ongoing upgrade this App is currently NOT available for TMA Answers for Self Submission. You reach out to us for TMA Submission with HIGH grades. Contact Us for NOUN Admission assistance/enquiry. Whatsapp 08133898192

GET the full Project Material


Categories

CIVIL ENGINEERING PROJECT TOPICS AND MATERIALS

ROUTE SURVEY AND DESIGN OF PAREMENT OF ROAD

Project Material on ROUTE SURVEY AND DESIGN OF PAREMENT OF ROAD

ROUTE SURVEY AND DESIGN OF PAREMENT OF ROAD

 

ABSTRACT

The study covers a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions. The need for easing the flow of traffic on this access road shall rise, since it’s a commercial center in the institution. It is required that the toad be revamped and generally upgraded. The existing road is no longer in peak condition and a result of traffic growth. The study modification therefore involves the assessment of the roads present condition, involving carrying out side test, and surveys etc, as to what could be done and how best to enhance traffic flow.


GET the full Project MaterialCLICK HERE