Loading...
"CLICK HERE TO JOIN NOUN WHATSAPP GROUP"
Digital Clock With Date
Day, Month 00, Year
   
00: 00: 00 AM
     

National Open University of Nigeria NOUN Admission for 2025 Academic Session still ONGOING/ACTIVE. Due to ongoing upgrade this App is currently NOT available for TMA Answers for Self Submission. You reach out to us for TMA Submission with HIGH grades. Contact Us for NOUN Admission assistance/enquiry. Whatsapp 08133898192

GET the full Project Material


Categories

BUILDING AND TECHNOLOGY PROJECT TOPICS AND MATERIALS

IMPORTANCE OF INCENTIVES AND MOTIVATION OF HUMAN ELEMENT IN CONSTRUCTION INDUSTRY

Project Material on IMPORTANCE OF INCENTIVES AND MOTIVATION OF HUMAN ELEMENT IN CONSTRUCTION INDUSTRY

IMPORTANCE OF INCENTIVES AND MOTIVATION OF HUMAN ELEMENT IN CONSTRUCTION INDUSTRY

 

TABLE CONTENTS

Approval page

Dedication

Abstract

Acknowledgement

Table of content

CHAPTER ONE

INTRODUCTION

1.1  Relevance of project

1.2  Site inspection

1.3  Evolution of road network in nigeria

1.4  Motor vehicle characteristic that affects road design data

1.5  Drivers and their characteristics

1.6  Reconnaissance survey

1.6.1Chain survey

1.6.2Station marking

1.7  Factors Affecting Choice Of Station

CHAPTER TWO

THEODOLITE TRANSVERSING OF THE ROAD CONTROL

2.1  Definitions

2.2  Thetheodolite

2.3  Theodorite adjustment

2.3.1Temporary adjustment

2.3.2Permanent adjustment

2.4  Procedure for theodolite traversing

2.5Materials used for the theodolte traversinging

CHAPTER THREE

PROJECT FIELD LEVELING WORK

3.1  Leveling

3.2  Profile leveling

3.3  Cross leveling

3.4  Objectives of leveling

3.5  Instruments used in leveling

3.6  Temporary adjustment of leveling instrument

3.7  Definition of some leveling terminologies

3.8  Leveling book

3.9  Earthwork computation

3.9.1Method

CHAPTER FOUR

SOIL ANALYSIS

4.1  Collection and preliminary preparation of samples

4.2  Mechanical analysis

4.3  Atterberg/consistency limit tests

4.3.1Liquid limit test

4.3.2Plastic limit test

4.4  Compaction test

4.5  The California bearing ratio (cbr) test

4.6  Pavement design using cbr

CHAPTER FIVE

GEOMETRIC ELEMENTS DESIGN

5.1  Basic design parameters

5.1.1Design speed

5.1.2Gradient

5.1.3Sight distance

5.2  Curve design

5.3  Curve parameters and formula used, in designing of horizontal curves

5.4  Vertical curve design

5.5  Cross sectional elements of the road

5.6  Brief description on stages of work and equipment used n road constriction

5.7  Summary and conclusion


GET the full Project MaterialCLICK HERE